Time-critical industrial shutdown, turnaround, maintenance and repair services for power, refinery, fertilizer and process industry facilities.
We undertake critical equipment dismantling, replacement, fabrication, welding, piping, installation and associated mechanical works, with a focus on completing assigned jobs within stipulated shutdown schedules.
Every hour of plant downtime has operational and commercial consequences. Our shutdown work is planned before the plant stops: scope frozen, work packs prepared, assemblies pre-fabricated and manpower mobilised. SGE’s core workforce of 100+, with the capacity to deploy 350+ workers during shutdowns, works round the clock under dedicated shift engineers and safety supervisors.
Shutdowns at our client plants have included the replacement of 408 reformer tubes in the GSFC Ammonia-IV plant, the replacement of a 40 MT ammonia tube bundle at KRIBHCO, Hazira, CPP IBR piping and an 18-inch P91 valve replacement in the 2026 turnaround at Nayara Energy, Vadinar, and boiler pressure-part replacements at fertilizer, refinery and captive power plants. Timely completion never comes at the cost of quality, safety or statutory compliance.