Core service 02

Reformer Replacement, Repair & Maintenance

Reformer tubes, coils, panels, modules and banks replaced, repaired and installed for refinery, fertilizer and process plants, with specialized alloy welding.

  • Reformer Tubes
  • Coils
  • Panels
  • Modules
  • Banks
  • Alloy Welding
  • Inspection & Testing

Comprehensive reformer maintenance and replacement services for refinery, fertilizer and process industry facilities.

Our work includes reformer tubes, coils, panels, modules, banks and associated assemblies, together with specialized alloy welding, fabrication, inspection and testing.

We undertake dismantling, removal, replacement, installation and associated structural and mechanical works.

The reformer sits at the heart of ammonia, methanol and hydrogen plants, and a reformer outage holds up the whole complex. Its tubes run at high temperature and pressure in cast high-alloy materials, so replacement demands more than manpower: a planned tube sequence, the right lifting arrangement through the roof or penthouse, and welders qualified for cast alloys and dissimilar-metal joints.

SGE has replaced 408 reformer tubes in the Ammonia-IV plant of GSFC, Vadodara, during the April 2013 shutdown — a complete tube replacement executed within the plant’s shutdown schedule. We bring the same planning to single-tube replacements, pigtail and header repairs and convection-section coil work: tubes mapped and numbered, materials received and checked before the shutdown, and every joint welded, examined and recorded.

Detailed work scope

What we replace, repair, fabricate and install

  • Reformer (catalyst) tubesCutting, removal and replacement of single tubes, rows or the complete radiant section
  • Inlet and outlet pigtailsReplacement, fit-up and welding of pigtails and their connections
  • Inlet and outlet headers and collectorsRepair, partial replacement and re-welding
  • Convection section coilsProcess, steam and feed-water coils and banks replaced as assemblies
  • Panels and modulesRemoval and installation of complete panels, modules and banks
  • Tube supports, hangers and counterweightsDismantling, refitting and setting
  • Burner, casing and penthouse openingsMechanical works needed for tube access and closure
  • Associated structural and mechanical worksPlatforms, supports, temporary lifting structures
  • Specialized alloy weldingHigh-alloy cast tubes, dissimilar-metal joints and Incoloy connections
  • Inspection and testingNDT, dimensional checks and pressure testing as specified

Execution methodology

How we execute the work

  1. 01

    Pre-shutdown planning

    Tube mapping and numbering, receipt inspection of new tubes and assemblies, welding procedures qualified for the cast alloys and dissimilar joints, and a lifting plan for tubes through the roof or penthouse.

  2. 02

    Access and dismantling

    After handover and cool-down, access and scaffolding are erected; penthouse, roof and casing openings are made and connections are cut free, in coordination with the catalyst-handling agency.

  3. 03

    Removal

    Old tubes, coils or modules are lifted out in sequence with purpose-made lifting tackle, keeping adjacent tubes, refractory and supports undamaged.

  4. 04

    Installation and alignment

    New tubes and assemblies are lowered, aligned for verticality and spacing, and their supports, hangers and counterweights set.

  5. 05

    Alloy welding and heat treatment

    Pigtail, header and outlet joints welded by qualified welders to the approved procedures, with pre-heat and heat treatment where the material requires it.

  6. 06

    Inspection and testing

    Radiography and dye-penetrant testing of welds, dimensional records and pressure or leak testing as specified by the licensor or client.

  7. 07

    Box-up and records

    Openings closed, structures restored and a complete record set handed over — tube map, welding, NDT and test records.

Codes & standards

Work to the applicable codes and your specification

  • Licensor and OEM specifications and approved drawings
  • ASME Section IX welding procedure and welder qualification
  • ASME B31.3 for pigtails and process connections, as specified
  • Client inspection and test plan (ITP)

Materials we work with

  • Centrifugally cast high-alloy reformer tubes
  • Incoloy 800H / 800HT
  • Alloy steel
  • Stainless steel

Records you receive

Material certificates, WPS/PQR and welder qualifications, fit-up and weld records, PWHT charts, NDT and test reports — compiled into one indexed dossier.

Project references

Jobs we have executed

Reformer Replacement & Repair

Replacement of 408 Reformer Tubes — Ammonia-IV Plant

GSFC · Vadodara, Gujarat

Complete replacement of the reformer tubes of the Ammonia-IV plant during the April 2013 shutdown: dismantling, removal, installation, alloy welding, inspection and testing.

Scale: 408 reformer tubes

See all projects → Completion certificates →

Send us your requirement

Request a quote — Reformer Replacement & Repair

To prepare a realistic scope and schedule quickly, please share:

  1. Reformer type and licensor, number of tubes and rows
  2. Scope — tubes, pigtails, headers, convection coils or complete section
  3. Tube material and dimensions, and drawings or datasheets
  4. Plant location and planned shutdown window

Attach drawings, datasheets or inspection reports to the form below (PDF, DWG, images, Excel or Word), or email them to info@sgeco.in.

We reply within one working day. See our privacy notice.

Have an industrial project or shutdown requirement?

Discuss your equipment replacement, repair, fabrication, erection or complete mechanical project requirements with our team.

Shree Ganesh Engineering Co.